工程合同中有關(guān)“時(shí)限”( The time limit)的常見(jiàn)表達

在收到材料的28天內,如果工程師沒(méi)有表明批準或不批準,上述材料即被認為得到了批準。 f he fails to do so within the time given in the Contract or the Programme or if no time limit is specified, within 28 days of receipt, they shall be deemed to
在收到材料的28天內,如果工程師沒(méi)有表明批準或不批準,上述材料即被認為得到了批準。
f he fails to do so within the time given in the Contract or the Programme or if no time limit is specified, within 28 days of receipt, they shall be deemed to be approved.
 
仲裁時(shí)間的限制Time Limit for Arbitration
 
Where the final day of a time limit falls on a public holiday or other statutory holidays, the day after the holiday shall be deemed to be the final day of the time limit, but this shall not apply to the case of Completion Date. Closing time for the final day of a time limit shall be midnight 24:00.
時(shí)限的最后一天是休息日或者其他法定節假日的,以節假日次日為時(shí)限的最后一天,但竣工日期除外。時(shí)限的最后一天的截止時(shí)間為當日24時(shí)。
 
If the Contractor fails to receive the written confirmation from the Employer’s Representative within the specified time limit, the Contractor shall raise the request for written confirmation within 7 days after the Employer’s Representative or his authorized representative gives the oral instruction; If the Employer’s Representative fails to reply within 2 working days after the Contractor raises the request for confirmation, the oral instruction shall be deemed as confirmed.
如承包人未在規定時(shí)間內收到發(fā)包人代表的書(shū)面確認的,承包人應于發(fā)包人代表及其授權人發(fā)出口頭指令后7天內提出書(shū)面確認要求;發(fā)包人代表在承包人提出確認要求后的2個(gè)工作日內不予答復的,視為口頭指令已被確認。
 
If the Engineers and the Employer’s Representative disagree on the requirement on deferring the commencement or the Contractor fails to submit the requirement within the prescribed time limit, the Project Period cannot be extended.
工程師和發(fā)包人代表不同意延期要求或承包人未在規定時(shí)間內提出延期開(kāi)工要求,工期不予順延。
 
承包人以書(shū)面形式將監理工程師的口頭指令變?yōu)闀?shū)面指令的時(shí)限
The time limit that the contractor changes the oral instruction into the written instruction with the written form
 
監理工程師向承包人免費提供設計圖紙及相關(guān)資料的時(shí)限
The time limit that the engineer freely provides the design drawing and related information
 
監理工程師應向承包人提供原始基準點(diǎn)等資料的時(shí)限
The time limit that the engineer shall provide the contractor the information about the original points.
 
在一般情況下組織開(kāi)始交工驗收(竣工檢驗)
The time limit that start to organize the project checking and receiving (test on completion)
 
頒發(fā)交工(移交)證書(shū)的時(shí)限The time limit that issues the taking-over certificate
 
缺陷責任期的時(shí)限the time limit of the defects liability periods
 
雇主提出已經(jīng)做出資金安排的時(shí)限
the time limit of the Employer's financial arrangement
 
雇主替換工程師的時(shí)限the time limit of the replacement of the Engineer
 
承包商提交履約保證的時(shí)限
the time limit of delivering the Performance Security to the Employer
 
承包商將履約保證有效期延長(cháng)至工程竣工和修補完任何缺陷的時(shí)限 the time limit of extending the validity of the Performance Security until the Works have been completed and any defects have been remedied.
 
雇主應對履約保證提出索賠的時(shí)限
the time limit that the Employer shall make a claim under the Performance Security
 
雇主退還履約保證給承包商的時(shí)限
the time limit of returning the Performance Security
 
雇主退還履約保證給承包商的時(shí)限
the time limit of returning the Performance Security
 
承包商將現場(chǎng)擬定各分包商開(kāi)工日期通知工程師的時(shí)限
the time limit that the Contractor five the Engineer the notice of the commencement such work on the Site
 
承包商將生產(chǎn)設備或其他主要貨物運到現場(chǎng)的日期通知工程師的時(shí)限the time limit that the Contractor shall give the Engineer the notice that any Plant or a major item of other Goods will be delivered to the Site
 
月進(jìn)度報告報告時(shí)間時(shí)限the time limit of monthly progress reports
 
工程師將參加試驗的意圖通知承包商的時(shí)限
the time limit of the notice of the Engineer's intention to attend the tests
 
工程師向承包商發(fā)出開(kāi)工日期通知的時(shí)限
the time limit of the Engineer's notice of the Commencement Date
 
開(kāi)工日期的時(shí)限Commencement of Works
 
承包商向工程師提交一份詳細的進(jìn)度計劃的時(shí)限
The Contractor shall submit a detailed time programme to the Engineer
 
工程師向承包商發(fā)出通知指出在進(jìn)度計劃中不符合合同要求的部分的時(shí)限
Engineer gives notice to the Contractor stating the extent to which it does not comply with the Contract
 
承包商可以要求工程師對已暫停的工程允許繼續施工的時(shí)限
the Contractor may request the Engineer's permission to proceed
 
承包商有權得到尚未運到現場(chǎng)的生產(chǎn)設備或材料的價(jià)值付款的時(shí)限
the time limit that the Contractor shall be entitled to payment of the value
 
受暫停影響的工程部分視為刪減項目的時(shí)限
the time limit of treating the suspension as an omission
 
承包商將他可以進(jìn)行每項竣工試驗的日期通知工程師的時(shí)限
the time limit of the Contractor's notice which ready to carry out each of the Tests on Completion
 
竣工試驗進(jìn)行的時(shí)限the date of the Tests on Completion
 
如果承包商不當地延誤了竣工試驗,承包商進(jìn)行下一次竣工試驗的時(shí)限
the time limit that the Contractor carry-outs the Tests which were unduly delayed by the Contractor
 
雇主人員可自行進(jìn)行竣工試驗的時(shí)限
the time limit that the Employer's Personnel may proceed with the Tests
 
承包商向工程師發(fā)出申請接收證書(shū)的通知的時(shí)限
the time limit taht the Contractor may apply by notice to the Engineer for aTaking-Over Certificate
 
工程師向承包商頒發(fā)接收證書(shū)的時(shí)限
issue the Taking-Over Certificate to the Contractor
 
工程師向承包商發(fā)出拒絕頒發(fā)接收證書(shū)的時(shí)限
reject issuing the Taking-Over Certificate to the Contractor
 
雇主應被視為已經(jīng)在竣工試驗原應完成的日期接收了工程或分項工程的時(shí)限
the time limit that the part which shall be deemed to have been taken overby the Employer
 
工程師頒發(fā)接收證書(shū)后,提前發(fā)出竣工試驗通知的時(shí)限
the time of notice that the Engineer shall require the Tests on Completion tobe carried out
 
缺陷通知期限不會(huì )延長(cháng)的時(shí)限
the time which the Defects Notification Period will not be extended
 
工程師發(fā)出進(jìn)一步試驗的時(shí)限the time limit of the Engineer's notice of Further Tests
 
履約證書(shū)頒發(fā)的時(shí)限the tome limit of issuing the Performance Certificate
 
雇主收回相關(guān)費用的時(shí)限the time limit that the Employer withdraws the related costs
 
作出對雇主更有利的價(jià)格調整的時(shí)限
the adjustment of price which is more favourable to the Employer.
 
承包商向工程師提交資料表中每項總價(jià)的價(jià)格建議分解表的時(shí)限
the time limit that the Contractor submit a proposed breakdown of each lump sum price in the Schedules
 
承包商將保函有效期延至預付款還清為止的時(shí)限
the time limit that the Contractor extends the validity of the guarantee
 
期中付款證書(shū)的申請時(shí)限Application for Interim Payment Certificates
 
承包商提交他預計應付的無(wú)約束性估算付款額的時(shí)限
the time limit that the Contractor shall submit non-binding estimates of the payments which he expects to become due
 
第一份估算提交的時(shí)限the time limit that the first estimate shall be submitted
 
工程師向雇主發(fā)出期中付款證書(shū)通知的時(shí)限
the time limit that the Engineer's notice of the Issue of Interim Payment Certificates
 
雇主向承包商支付首期預付款的時(shí)限
the time limit of the first installment of the advance payment
 
承包商向工程師提交竣工報表的時(shí)限
the time limit that the Contractor shall submit to the Engineer a Statement at completion
 
承包商向工程師提交最終付款證書(shū)申請的草案
the time limit that the Contractor shall submit a draft final statement
 
工程師向雇主發(fā)出最終付款證書(shū)的時(shí)限
the time limit of Issuing the Final Payment Certificate
 
雇主有權終止合同其中之一的時(shí)限
one of the time limits of terminated by Employer
 
雇主終止合同向承包商發(fā)出通知的時(shí)限
the Employer's notice to terminate the Contract
 
雇主終止合同生效的時(shí)限
the time limit that the Employer terminates the Contract
 
承包商暫停工作的時(shí)限the time limit of the Contractor's Entitlement to Suspend Work
 
承包商有權終止合同的其中之一的時(shí)限
one of the time limit of the Termination by Contractor
 
承包商有權終止合同的其中之一的時(shí)限
one of the time limit of the Termination by Contractor
 
承包商有權終止合同的其中之一的時(shí)限
one of the time limit of the Termination by Contractor
 
承包商有權終止合同的其中之一的時(shí)限
one of the time limit of the Termination by Contractor
 
一方向另一方發(fā)出關(guān)于17.5【知識產(chǎn)權和工業(yè)產(chǎn)權】的索賠,對方應被認為已經(jīng)放棄根據本款規定的任何受保障的權力的時(shí)限
one party made a claim under Sub-Clause[Intellectual and Industrial Property Rights],and the other has been deemed to have waived any right to indemnity under this Sub-Clause
 
一方發(fā)出不可抗力通知的時(shí)限the time limit of one party's notice of Force Majeure
 
自主終止合同生效的時(shí)限the time limit of Optional Termination
 
承包商發(fā)出索賠通知的時(shí)限the time limit of the notice of the Contractor's Claims
 
承包商向工程師提交一份充分詳細的索賠報告的時(shí)限
the time limit that the Contractor shall send to the Engineer a fully detailed claim
 
工程師在收到索賠報告作出回應的時(shí)限
the time limit that the Engineer gives response on the principles of the claim
 
專(zhuān)用條件中指定的機構或官方應根據合同一方或雙方的要求,并在與合同雙方適當協(xié)商后,提名該爭端裁決委員會(huì )成員
the appointing entity or official named in the Appendix to Tender shall, upon request of either or both of the Parties and after due consultation with both Parties appoint this member of the DAB
 
DAB作出決定的時(shí)限the time limit that the DAB shall give its decision
 
一方對DAB決定不滿(mǎn)意對另一發(fā)發(fā)出通知的時(shí)限
the time limit of one party gives notice to the other Party of its dissatisfaction
 
DAB作出的決定生效的時(shí)限the decision shall become final and binding upon both Parties.
 
仲裁進(jìn)行的時(shí)限the time limit of the commencement of the Arbitration
 
在監理工程師的口頭指令發(fā)出后的3天內
Within 3 days after the oral instruction issued by the engineer
 
在中標通知書(shū)發(fā)出后的42天內Within 42 days after the letter of acceptance issued
 
在發(fā)出開(kāi)工通知書(shū)后14天內Within 14 days after the commencement advice notice issued
 
在承包人提出交工驗收的申請后21天內
Within 21 days after the application of the test on completion issued
 
交工驗收完畢且工程合格后14天內
Within 14 days after the done of test on completion and engineering qualified
 
一般規定為2年,工程在缺陷責任期之后還將進(jìn)入保修期,保修期一般為5年
Generally defined 2 years , and it would enter into warranty period a after the defects liability period, the warranty is generally 5 years