合同編號: Contract No.
簽約地點(diǎn): Signature Place
簽約日期: Signature Date
買(mǎi)方:中國某航空股份有限公司
Buyer: China
地址:Address
電話(huà): Telephone
傳真:Facsimile
賣(mài)方:
地址:
電話(huà):
傳真:
1.甲方為依中華人民共和國法律合法組織存在、享有良好商譽(yù)、從事航空運輸業(yè)務(wù)之法律主體;乙方是在美國加州Torrance市正式成立和注冊的直升飛機制造商。雙方均有權力簽署并履行本協(xié)議及有關(guān)的其他協(xié)議和文件。
Party A is a duly organized legal entity engaging in aviation transportation business, validly existing and in good standing under the laws of the People's Republic of China; and Party B is a helicopter manufacturer duly organized and registered and in good standing in Torrance, California,the United States. Parties hereto have their duly power and authority to enter into and perform this AGREEMENT and any other agreements and documents herewith.
Parties hereto confirm thant
2. 商品名稱(chēng):全新Robinson R44 Clipper II 型直升機以及選裝設備(以下簡(jiǎn)稱(chēng)為:貨物)。
Merchandise name: helicopter of complete new Robinson R44 Clipper II type and chosen equipments herewith (hereinafter referred to as DOODS)
3. 商品(貨物)數量和單位:壹(1)架
Merchandise(DOODS) amount and unit: one (1) set.
4. 原產(chǎn)地和生產(chǎn)廠(chǎng):美國,羅賓遜直升機公司(ROBINSON HELICOPTER COMPANY, USA)(以下簡(jiǎn)稱(chēng)為“原廠(chǎng)”)
5.合同總金額:美元肆拾伍萬(wàn)伍仟陸佰柒拾元整(USD 455,670),中國上海(完稅后交貨) 。
The contract total amount of money: U S Dollar four hundred and fifty-five thousand, six hundred and seventy only(U S Dollar 455,670 only). DDU Shanghai China.
6.貨物內容及價(jià)格包括:DOODS contents and price inclusion
Aquatic helicopter , Robinson R44 Clipper II can buoy type with original factory standard allocation; (the original factory DOODS standard allocation refered to the Annex 1 )
The conveyance and the insurance of the DOODS in the American inland, the sea conveyance and insurance and the conveyance and insurance in the territory of China.
The chosen equipments with the DOODS herein being requested by party A include as follows:
The model of
David Clark the H10-13 H headphones(4 sets)
Reconstruction, adjustment and debugging, and validation flight of the DOODS in China.
7.運輸及保險:國際運輸方式為海運,CIF中國上海浦東,保險由乙方代保,險別為全
險,保險金額為貨物總價(jià)值的110%。
Transport and insurance:The international conveyance method is a sea transportation, CIF Pudong Shanghai, China. The insurance is entrusted to effect by party B, insurance sum shall be 110% of the value of total value against All Risks.
8.海運包裝:貨物將由三個(gè)不同尺寸木箱裝載,并裝在一個(gè)上敞口40英尺集裝箱內付運。
所供貨物必須由乙方妥善包裝,適合遠洋及長(cháng)途內陸運輸,防潮、防濕、防震、防銹、大力搬運,以確保貨物不會(huì )由上述原因導致受損,使之完好安全到達安裝地。凡由于包裝不良所造成的損失和費用或由于防護措施不妥發(fā)生銹損所造成的損失和費用均由乙方承擔。
The DOODS shall be loaded by three different size wood boxes, and packed in a container with up open of 40 feet. The DOODS provided by party B should be appropriate packed suitable to the ocean and long distance inland conveyance,which being protected against dampness, mosture, shock, rust and rough handling and ensuring that the DOODS can't be damaged by the above-mentioned reasons, and arrive safely installation place. Party B shall be liable for any damage to the GOODS on account of improper packing and for any rust damage attributable to inadequate or improper protective measures taken by Party B, and in such case or csses any and all losses and / or expenses incurred in consequence thereof shall be borne by party B.
9.運輸標志(嘜頭): Transport mark
10.發(fā)貨日期及發(fā)貨港:乙方在收到甲方付出的本合同第13-1條款中規定的定金后,于24個(gè)星期內發(fā)貨,發(fā)貨港為美國洛杉磯港。
Party B upon receiveing the deposit stipulated in Article 13-1 herein by party A shall effect consignment within 24 weeks. The port of dispatch is Los Angeles, the United States
11.目的港及最終交貨地: Destination and the place of final delivery
11-1.目的港:中國上海浦東;Destination: Pudong Shanghai, China
11-2.最終交貨地:甲方指定的貨物再組裝地及最終交貨地是中國杭州。
The place of final delivery:
12.交付日期:當乙方收到甲方支付的訂金后的200天內,貨物運抵最終交貨地。如甲方在貨物運抵最終交貨地之前,未能按時(shí)辦理貨物的進(jìn)口文件及未能按時(shí)交付關(guān)稅和增值稅,影響到乙方按時(shí)交付貨物,則乙方的貨物交付日期順延。
The date of delivery: Within Two hundred (200) days from receiving the deposit paid by Party A the DOODS shall arrive at the final place of delivery. If due to the cause that party A fail to effect the import document and clear customs duty and value added tax prier to the DOODS arrive the final delivery place and make holdback to Party B’s delivery in time, the date of delivery shall be postponed
13.付款方式:Payment
The deposit: Party A shall, within three (3) working days, viz. before and on 22th September, 2007
13-2.累進(jìn)付款:在甲方收到乙方的貨物出廠(chǎng)日期通知和累進(jìn)付款正式發(fā)票(一式三份)后的叁(3)個(gè)工作日內,且于2012年2月10日之前,甲方應以電匯的方式(T/T)向乙方指定的銀行帳戶(hù)支付累進(jìn)款,其金額為合同總價(jià)的87%,即美元叁拾玖萬(wàn)陸仟肆佰叁拾貳元玖拾分整(U S Dollar
The progressive payment: The party A should, within three (3) working days upon receiving the notice of the date of the DOODS delivered by manufacture from party B and formal invoice of progressive payment (in triplicate copies), and before and on 10th. February, 2012, disburse the sum of progressive payment into the bank account designated by Party B which is equal to the amount of 87% of
13-3.尾款:在收到乙方提交的第13-4項所列文件后的叁(3)個(gè)工作日內,或在貨物運抵最終交貨地后的30天內,因甲方的原因造成乙方無(wú)法進(jìn)行第6-4項中所列工作,則以先到時(shí)間為甲方向乙方支付尾款的限期。甲方應將本合同尾款(合同貨款總價(jià)值的3%)即美元壹萬(wàn)叁仟陸佰柒拾元拾分整(美元 13,670.10元整)通過(guò)電匯方式(T/T)付至乙方指定帳戶(hù);
Remaining fund: If, party B fail to effect the works listed Sub-Clause 6-4 herein, due to the reason of party A, within three (3) working days upon receipt of the documents listed Sub-Clause 13-4 herein submitted by party B, or within ten (10) days upon the date in which the DOODS arriving the place of final delivery, the limited time of paying remaining fund shall be subject to the first time of arriving. Party A should disburse the sum of remaining fund into the bank account designated by Party B by telegraphic transfer (T/T), which is equal to the amount of 3 % of the total contract prices, viz. U S Dollar thirteen thousand, six hundrad and seventy and ten cent only (U S Dollar 13,670.10 only ).
13-4.甲方在向乙方支付尾款前,乙方應向甲方提供的文件:
The party B should, prior to party A’s
a)由甲方和乙方共同簽署的,貨物已由甲方驗收合格的證書(shū)正本一份,該證書(shū)須注明貨物各項技術(shù)指標符合合同及技術(shù)附件要求,且乙方已完成合同賦予乙方的責任;或因甲方原因造成乙方無(wú)法按時(shí)交貨的說(shuō)明/通知函一份。
One copy of original certificate of qualified acceptance of DOODS by party A which cosigned by parties hereto, on which the indication of the conformance of various technique index with the requirements of this contract and technique annex, and party B’s accomplishment of its responsibilities hereby, or one copy of explanation / notice on the reason of party B’s failure of delivery due to party A.
b)由乙方出具的商業(yè)發(fā)票一式三份,標明合同號、發(fā)票號、合同總價(jià)和尾款應付金額;
The commercial invoice in triplicate being submitted by party B on which the indication of contract number, invoice number, contract total price and tail funds be due and payable.
13-5. 在中國境內所發(fā)生的銀行費用由甲方支付,中國境外及在香港所發(fā)生的銀行費用由乙方支付。
The bank expenses arising with the territory of China shall be born by party A, the same arising outside the territory of China and Hong kong shall be born by party B.
14.交貨資料:乙方在收到甲方的累進(jìn)付款后要提供給甲方以下資料:
Delivery document: Party B should, upon receipt of the progressive payment form party A, provide party A with following documents:
14-1.已裝船,運輸提單正本,空白抬頭,空白背書(shū),注明運費已付;
The Original copy of the tranportation bill for being shipped on board, order and endorsed in blank and indication of freight paid.
14-2.由乙方出具的裝箱單一式三份,并注明每件貨物的數量、毛重和凈重,美國政府
有關(guān)部門(mén)出具的木質(zhì)熏蒸證明或非木質(zhì)包裝證明;
The packing list in triplicate issued by party B on which the indication of the number of each piece of cargo, gross and net weight and the certificate of packaging with suffocated wood or non-wood material issued by the authority institute of American government.
14-3.保險單正本一份,副本一份;
One copy of original insurance policy, with one duplicated copy of the same.
14-4.貨物在美國洛杉磯港裝船后10日內發(fā)出的裝船通知書(shū)復印件一份。
One duplicated copy of the shipment notice issued within ten (10) days from and upon the shipment of the DOODS at the port of Los Aangeles, USA.
15.技術(shù)文件:乙方必須在合同貨物驗收并交付給甲方時(shí),免費向甲方提供下列全套英文版
技術(shù)文件;
Technical Documents: Party B should, upon the time on which the inspection / acceptance and delivery of the DOODS herein, offer free of charge to party A for following the whole set of technical documents in English.
15-1.原廠(chǎng)英文版 《R44 Pilot’s Operating Handbook》 壹本;
One copy of R44 Pilot’s Operating Handbook in English from original manufacturer.
15-2.原廠(chǎng)英文版《IO-540 Engine Operator’s Manual-Lycoming》壹本;
One copy of IO-540 Engine Operator’s Manual-Lycoming in English from original manufacturer.
15-3.原廠(chǎng)英文版《R44 Maintenance Manual》壹本;
One copy of R44 Maintenance Manual in English from original manufacturer.
15-4.原廠(chǎng)英文版《R44 II Lustrated Parts Catalog》壹本。
One copy of R44 II Lustrated Parts Catalog in English from original manufacturer.
16.甲方責任:Party A’s responsibility
Party A shall pay by their own to all taxes and fees related to the DOODS hereon within the territory of China which include China’s customs duties, VAT, import fees, incidental expense of quay and inspection charges, ect.
機身險和第三者責任險等保險;
Party A should, within ten (10) days prior to the final transporting to the place of delivery, effect insurance covering All Risks including Fuselage insurance and third party liability insurance.
16-3.貨物經(jīng)再組裝調試并驗證飛行合格后,甲方須于叁(3)個(gè)工作日之內對貨物進(jìn)行
驗收,并在貨物交付驗收證明書(shū)上簽字;
Party A should, within three (3)days after the reassembly, debugging of the DOODS herein and qualification of verifying flight, make acceptance and signature on the certificate of delivery and inspection of the DOODS.
16-4.甲方須無(wú)條件免費向乙方提供本合同項下貨物的30個(gè)飛行小時(shí)用于貨物維護、維修試飛及乙方展示(本30小時(shí)包含合同附件二第十條中所需20飛行小時(shí))之用;
Party A shall provide party B with thirty (30) flight hours, unconditionally and free of charge, for the purpose of maintenance, servicing and demonstration of the DOODS herein, which shall contain the twenty (20) hours stipulated in Clause 10 of appendix 2 herewith.
16-5.本合同簽署后,甲方必須在2008年2月10日之前與乙方指定的維修單位簽訂貨
物的總服務(wù)協(xié)議。如甲方未能按時(shí)簽訂總服務(wù)協(xié)議,則乙方有權拒絕為貨物提供除原廠(chǎng)保修之外的售后服務(wù)。
Party A should, before and on the date of 10th February 2008 from and upon the signature of this contract, conclude and inter into the general agreement of maintenance service with the maintaining server specified by party B. In case of party A’s failure of signature of the same, party B shall be entitle to refuse to provide the after-sale service other than the original warranty for the DOODS herein.
16-6.甲方在索賠期內對羅賓遜直升機工廠(chǎng)擔保的由其他廠(chǎng)家制造的部件、設備和儀表進(jìn)行索賠時(shí),需先向乙方支付購買(mǎi)新件的部件費,并將舊件退回原廠(chǎng),其間發(fā)生的相關(guān)中間費用包括:舊件、新件的往來(lái)運費、保險費、關(guān)稅、增值稅等費用均由甲方承擔;在羅賓遜公司對舊件進(jìn)行檢查并認定舊件存在質(zhì)量問(wèn)題后,會(huì )將定購新件的部件費退還給乙方。
Party A should, claiming for the part, the equipment and measuring appliance made by the part plant which guaranteed by the Robinson helicopter factory within the claim period, make the payment for purchasing of the new part in advance and return the old part to the original manufacturer. The costs and expenses arising therefrom at meanwhile shall be borne by party A, which include such as the freight fees of old/new part come-and –go, insurance, customs duties, VAT, and like. Robinson company shall, upon examination and check up of returned old part and confirm the same with the technical flaw and defects, make reimbursement of the payment for ordering the new part paid by party B.
16-7.甲方必須按時(shí)付款; The payment on schedule effected by party A
16-8.甲方必須在貨物運抵最終交貨地之前,取得全部進(jìn)口文件,以保證乙方能夠按時(shí)在最終交貨地交貨。否則,甲方將負全部責任;
Party A should, prior to the arriving at the final place of delivery, obtain all import documentation to enable party B on schedule make delivery thereat, otherwise, party A should take full responsibility for the same.
16-9.甲方必須在貨物運抵最終交貨地之時(shí),及時(shí)繳納關(guān)稅和增值稅,以保證乙方能夠按時(shí)在最終交貨地交貨。否則,甲方將負全部責任;
Party A should, prior to the arriving at the final place of delivery, effect any and all custom duties and value added tax so as to enable party B on schedule make delivery thereat, otherwise, party A should take full responsibility for the same.
17.乙方責任:Party B’s responsibilities
17-1.乙方必須保證所供貨物系用標準材料和一流工藝制造,嶄新、未曾使用(試飛和驗證飛行除外)并在各方面都與合同規定的質(zhì)量、規格和性能相符;
Party B shall ensure that the DOODS are made in standard materials and first-class workmanship, newness and without being used except for the fight test and velidated flight, and in all respects conformity with the quality, specifications, and performance hereunder.
17-2.乙方協(xié)助甲方根據中國民航管理部門(mén)有關(guān)規定辦理貨物在中國的國籍注冊登記手續、適航注冊等文件;
Party B shall, according to the relevant provisions of Chinese civil aviation authorities, assist Party A with transaction of documents such as the procedure of nationality registration and airworthiness, ect.
17-3. 乙方負責在合同規定的交貨期內將貨物安全運抵最終交貨地;
Party B should, within the period of delivery, make the safe transportation of the DOODS to the final delivery place.
17-4. 乙方負責貨物在中國境內的再組裝、調試和驗證飛行。
Party B shall be responsibility to re-assembly, adjustment /test and validated flight within the territory of China.
18.合同生效條件:甲、乙方必須在下列三個(gè)附件上簽字后,本合同方可生效。且附件一至附件三作為本合同不可分割的部分,與本合同具同等約束地位。
Effective condition hereof: This contract shall be effective upon the signature of follow annexes by parties hereto, and annexes 1 to 3 herewith as the integral part of the contract shall have equal binding force with this contract.
19.
Annexe1: The list of standard equipment of Aquatic helicopter of Robinson R44 Clipper II can buoy type;
Annex 2: Robinson Helicopter Company- Purchase Agreement;
附件三:羅賓遜直升機公司有限責任飛機質(zhì)保證
Annex 3: Robinson Helicopter Company, INC, Limited Aircraft Warranty.
20.違約處理:Breach of Contract
20-1.如果乙方未能按時(shí)在最終交貨地向甲方交貨,因甲方的原因除外,則乙方應向甲
方支付違約罰款金,罰款比率為每七天罰合同金額的0.5%,不足七天按七天計算;
The party B shall, if fail to make delivery of the DOODS at the place of final delivery on schedule, other than as the cause of party A, pay the penalty of breach to party B ,for which such penalty rate as 0.5% on the total amount of contract per seven (7) days, if less than 7 days, the penalty shall be accounted by 7 days.
20-2. 如果甲方未能按本合同第13條的規定進(jìn)行付款,甲方應向乙方支付延遲付款金,
延遲付款的罰款比率為每七天罰應付款的0.5%,不足七天按七天計算。貨物到期及交付日期亦相應順延;
Party A shall, if fail to effect the payment of DOODS under clause 13 hereof, pay penalty for delayed payment for which such penalty rate as 0.5% on the total amount of contract per seven (7) days, if less than 7 days, the penalty shall be accounted by 7 days. The date of arriving and delivery shall be correspondingly postponed.
20-3. 如因甲方的原因而發(fā)生下列所列情況,則甲方應向乙方支付違約罰款金,罰款比率為每七天罰應付款的0.5%,不足七天按七天計算。貨物的交付日期則順延:
Party A shall, in case of following matters resulting by the reason of party A, pay penalty for delayed payment for which such penalty rate as 0.5% on the total amount of contract per seven (7) days, if less than 7 days, the penalty shall be accounted by 7 days. The date of arriving and delivery shall be correspondingly postponed.
(1)甲方未能按時(shí)為貨物購買(mǎi)本合同第14-3項中規定的保險;
Party A fail to effect the insurance for the DOODS on schedule stipulated under sub-clause 14-3 hereof.
(2)甲方未能按時(shí)為貨物進(jìn)口到中國取得全部的合法的進(jìn)口文件;
Party A’s failure of acquirement of all legal documents for the import DOODS on schedule.
(3)甲方未能按時(shí)為貨物進(jìn)入中國海關(guān)時(shí),交納應付關(guān)稅和增值稅;
Party A’s failure of payment of customs duties and VAT due and payable timely for the DOODS clearance of customs.
21. 不可抗力: Force Majeure
戰爭、罷工、暴動(dòng)和雙方同意的其它情況)無(wú)法履約,在受阻方提供了必要的證明文件情況下,履約期限則可按照不可抗力所影響的履約時(shí)間作相應延長(cháng);
In case any party hereto being unable to perform its duties and responsibilities herein for the cause of force majeure which include storms, floods, typhoons, earthquakes, disaster, war, strike, riot, and otherwise agreed by parties hereto, upon the provision of the necessary supporting documents by such suffocated party, the term of performance could be extension according to the affected time of force majeure.
超過(guò)60天,另一方則可利用任何形式的書(shū)面通知告知受阻方中止合同。
The suffocated party should within 72 hours after he occurrence of force majeure notify the opposite. In case of the extension of force majeure more than sixty (60)days, the opposite shall be entitle to nitify in any form of writing the suffocated party for termination of contract.
22. 仲裁: Arbitration
題仍得不到解決,可訴諸仲裁;
Where any dispute on commercial clause arising out of the duration of performance, which should be settled and resolved through amicable negotiation, if that, satisfactory resolution is not reached, the dispute shall be submitted to resolution by arbitration.
22-2. 仲裁應在中國北京中國國際貿易促進(jìn)會(huì )對外貿易仲裁委員會(huì )按照其程序仲裁,也
可提交雙方同意的第三國或地區仲裁機構;
The application of arbitration should be submitted to China International Trade Promotion of Foreign Trade Arbitration Commission under China Council for the Promotion of International Trade for arbitration in accordance with its procedure and also submitted to the arbitration institution in the third country or region.
The verdict of arbitration institution with final effect should be executed and performed by parties hereto.
During the arbitration parties hereto should continue to perform and execute other provisions except the disputed part herein.
23.特別條款: Miscellaneous
23-1.本合同項下貨物的質(zhì)量擔保和索賠依據按附件三執行。對于發(fā)動(dòng)機等原廠(chǎng)擔保索
賠范圍之外的部件、設備和儀表,乙方將負責與有關(guān)生產(chǎn)廠(chǎng)家進(jìn)行索賠協(xié)調工作;
The guarantee and claim of the DOODS hereunder should be subject to Annex III. For the parts, equipment and instrumentation other than the scope of guarantee by and claim to original manufacturer, such as engine, etc. party B shall be responsible for the coordination of claim with concerned manufacturer.
23-2.本合同用中英文兩種文字寫(xiě)成,兩種文字具有同等效力。如中英文內容有矛盾均以英文內容為準;本合同正本一式四份,買(mǎi)賣(mài)雙方各二份。
23-3.所有附件簽字后均具有法律效力;如本合同與附件在關(guān)于附件內容的敘述上有任何沖突,則以附件為準;
All annex upon signature shall be with legal force. In case of any ambiguity or discrepancy on the explanation or specification of the content of annex between this contract and annex, the annex shall be prevail.
23-4.本合同由雙方授權代表在上述日期代表各方簽署訂立,特此為證。本合同于雙方簽字蓋章之日起生效,至原廠(chǎng)提供的質(zhì)保期結束時(shí)終止。
IN WITNESS WHERE OF, the parties hereto have caused this agreement to be executed by duly authorized representatives on the date first written above. The effective date of this contract shall commence upon the date of signature and seal by parties hereto, which shall terminate on end and conclusion of guarantee period by original manufacturer.
甲方:(代表簽字/蓋章)
Party A :
Signature / seal by
2019-06-18雙語(yǔ):寶武擬收購馬鋼,產(chǎn)量將超美國總量
2019-05-31銳參考|中美女主播辯論后,美國網(wǎng)友的反應
2019-05-29德國做了一項涉及中國和美國的調查,結果令
2019-02-13為什么說(shuō)機器翻譯與美國國家安全息息相關(guān)
2018-09-29看大陸貿易戰正在正面硬剛美國 臺灣果然也
2018-04-19美國私募發(fā)行股權認購協(xié)議
2018-01-23美國電煤買(mǎi)賣(mài)合同
2017-11-01美國保健食品經(jīng)銷(xiāo)合同
2017-07-07美國醫用電冰箱經(jīng)銷(xiāo)合同 (第二部分 中英文
2017-07-06美國醫用電冰箱經(jīng)銷(xiāo)合同 (第一部分 中英文
支付寶
微信
銀行轉賬:1023 4010 2100 0993 618